|
Last Modified: 11-29-2007 |
1.6 A |
|
Service Category: Drivetrain |
Section: Automatic Transmission/Transaxle |
|
Model Year: 2008 |
Model: Sequoia |
Doc ID: RM000003F6T000X |
|
Title: A750E AUTOMATIC TRANSMISSION / TRANSAXLE: OIL COOLER: INSTALLATION (2008 Sequoia) |
INSTALLATION
1. INSTALL TRANSMISSION OIL COOLER ASSEMBLY (w/o Trailer Towing System)
|
(a) Coat 2 new O-rings with ATF, and install them to the transmission oil cooler.
|
(b) Align the transmission oil cooler with the transmission oil cooler spacer and assemble them with the 3 bolts.
Torque: 8.0 N·m (82 kgf·cm, 71 in·lbf)
(c) Connect the 2 transmission oil cooler hoses to the transmission oil cooler spacer with the 2 clips.
|
(d) Temporarily install the transmission oil cooler with transmission oil cooler spacer with bolt A.
|
(e) Install the bolt B and tighten it to the specified torque. Then tighten bolt A to the specified torque.
Torque: 21 N·m (214 kgf·cm, 16 ft·lbf)
(f) Connect the 2 transmission oil cooler hoses with the 2 clips.
HINT:
Make sure the pinching portion of each clip is facing the direction shown in the illustration.
2. INSTALL TRANSMISSION OIL COOLER ASSEMBLY (w/ Trailer Towing System)
|
(a) Coat 2 new O-rings with ATF, and install them to the transmission oil cooler.
|
(b) Align the transmission oil cooler with transmission oil thermostat and assemble them with the 3 bolts.
Torque: 8.0 N·m (82 kgf·cm, 71 in·lbf)
(c) Connect the 2 transmission oil cooler hoses to the transmission oil thermostat with 2 clips.
|
(d) Temporarily install the transmission oil cooler with transmission oil thermostat with bolt A.
|
(e) Install the bolt B and tighten it to the specified torque. Then tighten bolt A to the specified torque.
Torque: 21 N·m (214 kgf·cm, 16 ft·lbf)
(f) Connect the 2 transmission oil cooler hoses with the 2 clips.
HINT:
Make sure the pinching portion of each clip is facing the direction shown in the illustration.
|
(g) Connect the 2 No. 2 transmission oil cooler hoses to the transmission oil thermostat.
|
3. CONNECT WATER BY-PASS PIPE ASSEMBLY
|
(a) Connect the 2 water by-pass hoses with the 2 clips and install the water by-pass pipe with the bolt.
Torque: 18 N·m (184 kgf·cm, 13 ft·lbf)
HINT:
Make sure the pinching portion of each clip is facing the direction shown in the illustration.
|
4. INSTALL HOSE HEAT PROTECTOR
|
(a) Install the hose heat protector with the bolt.
Torque: 21 N·m (214 kgf·cm, 16 ft·lbf)
|
5. INSTALL FRONT EXHAUST PIPE ASSEMBLY
6. ADD ENGINE COOLANT
7. ADJUST AUTOMATIC TRANSMISSION FLUID
(a) Adjust automatic transmission fluid
.
8. INSPECT FOR AUTOMATIC TRANSMISSION FLUID LEAK
9. INSPECT FOR ENGINE COOLANT LEAK
10. INSPECT FOR EXHAUST GAS LEAK
|